Element I: Item INTRODUCTION
1. Description: Mechanical tubing is a variety of metal tube widely utilized automotive sector, engineering location, as nicely as machinery parts. Normal specification of mechanical tubing is ASTM A519, covering carbon steel gardes and alloy steel grades.
two. Commodity: SAE1541 Cold drawn seamless mechanical tubing
three. CZPT specification: ASTM A519, BS6323-four, CZPT specification.
4. Available steel quality: Numerous carbon steel and alloy steel grades which includes but not limited to the following:
ASTM A519: | SAE1571,SAE1571,SAE1026,SAE1045,SAE1518,SAE1524,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,SAE8620 |
BS 6323-4: | CFS3,CFS4,CFS5,CFS7,CFS8,CFS9,CFS10,CFS11 |
EN/DIN: | ST35,ST45,ST52,E195,E235,E355,C35E,C45E,25CrMo4,34CrMo4,42CrMo4, |
five. Size assortment:
OD: | upto 356mm |
ID: | upto 300mm |
W.T: | not constrained |
6. Manufacture strategy: Chilly rolled, Chilly drawn, CZPT chilly drawn
7. Shipping Situation:
BK | BKW | BKS | GBK | NBK | Q+T |
+C | +LC | +SR | +A | +N | |
Chilly rolled | Chilly drawn | Pressure relieved | Annealed | Normalized | Quenched+Tempered |
eight. Finish end: simple ends with square cuts,bevelled finishes.
nine. CZPT export packing: in bundles tied with steel strips. Inner and exterior oil coating. Exterior packing by PVC luggage and knit luggage.
ten. CZPTized packing or marking are CZPT upon request.
MECHANICAL TUBING WITH THICK WALL:
MECHANICAL TUBING WITH Quality 4140 Q+T:
MECHANICAL TUBING Without Warmth Dealing with:
Part II: Often Requested Inquiries
1. MOQ: three-five tons/dimension for carbon metal grades, ten-20 tons/dimension for alloy metal gardes.
2. Shipping Time: 20-thirty days for carbon metal mechanical tubings, thirty-50 days for alloy metal mechanical tubings.
3. Guarantee&Guarantee: Warranty&promise period is 6 months considering that we deliver the tubes, and we are not accountable for good quality dilemma caused by incorrect unloading or storage after cargo. We welcome customer’s inspection prior to shipment.
four. Payment Technique: We take payment method like T/T, L/C, or D/P, but it relies upon on our investigation about customers. We have a solution to consider the credit of consumers from all over the globe, and time and volume of D/P we can launch is established by the evaluation.
5. Quality Manage: We obtain raw content from stable suppliers who are major metal mills, and we examine the raw materials as per the technical specs. In the course of our production procedure, there is inspection and quality manage in every stage.
Part III: Business INTRODUCTION
We are a manufacturer of cold drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm given that 2002. Masking an region of about 32000M2, we have 12 common workshops with two hydraulic cold drawing benches, 4 chain cold drawing benches, and two ERW mills. Our facilities covers all the generation methods from pickling, cold drawing,heat dealing with,observed cutting, straightening,inspection,packing to more machining &turning, chilly drawing die fabrication, and equipment repairation&routine maintenance.
Manufacturing facility Physical appearance:
Raw Substance Stock:
Cold DRAWING DIE WAREHOUSE:
HYDRAULIC Chilly DRAWING:
Heat Managing FURNACE:
MULTI-ROLLER STRAIGHTENING:
STRAIGHTENING BY Push:
Saw Chopping: